HDB Renovation Permit Checklist Tool
Select the works you plan and this tool sorts them into HDB permit required, no permit needed (conditions still apply), or not allowed, based on HDB's Renovation Guidelines for Building Works.
On this page3 sections · tap to jump
Tick the works on your renovation list to see, at a glance, which need an HDB permit, which don’t, and which HDB will not allow at all.
Renovation permit checklist
Guidance only — based on HDB’s Renovation Guidelines for Building Works. Your contractor applies for the permit; confirm the current rules with HDB before starting.
Based on HDB Renovation Guidelines for Building Works. As of October 2026.
How it is classified
Each work is mapped to one of three outcomes, straight from HDB’s Renovation Guidelines for Building Works:
- Needs an HDB permit — HDB’s prior written approval is required before the work starts. Examples: hacking or demolishing any wall, replacing floor finishes (which means removing the old ones), replacing internal wall finishes up to ceiling height, retiling or enlarging a bathroom, and replacing windows.
- No permit needed — approval is not required, but HDB’s conditions still apply. Examples: overlaying flooring without hacking, erecting a 63mm hollow-block or gypsum partition, painting and wallpaper.
- Not allowed — disallowed building work. Examples: hacking structural members (RC walls, columns, beams, slabs), touching the household shelter, raising the floor more than 50mm, overloading the slab beyond 150kg/m², and plastering ceilings.
Your contractor submits the permit application to HDB on your behalf; you should only start permit-controlled works once approval is granted.
A worked example (illustrative)
Planning to hack the kitchen half-wall, overlay vinyl over sound tiles, and repaint:
- Hack the half-wall → needs an HDB permit (all wall hacking requires prior approval; demolish only to the underside of the RC beam).
- Overlay vinyl → no permit (as long as there’s no hacking, no cement screed and no raising of the floor).
- Repaint → no permit (but you still can’t paint the external parts of the flat).
So one of the three triggers a permit — and all three must be done by a DRC-listed contractor.
Limits of this estimate
- This is guidance, not approval — it does not submit anything to HDB or guarantee a permit will be granted.
- It covers common works; unusual items (gas works, major plumbing, structural alterations) always need professional advice and HDB confirmation.
- Rules change. Confirm the current position on HDB’s building-works page before you start.
Related
Sources
- Renovation Guidelines for Building Works — Housing & Development Board (HDB) (as of October 2026)
- Important Information on Renovations — Housing & Development Board (HDB) (as of October 2026)